WORDS ON THE STREET 70th anniversary of Hanoi's Liberation Day Vietnam - Asia 2023 Smart City Summit Hanoi celebrates 15 years of administrative boundary adjustment 12th Vietnam-France decentrialized cooperation conference 31st Sea Games - Vietnam 2021 Covid-19 Pandemic
Home / Hanoinews
Hanoi’s first metro line to start operating from Nov 6
Anh Kiet 23:35, 2021/11/04
The China-financed urban railway took 10 years of construction and exceeded 205% of the initial investment.

The Ministry of Transport will hand over the China-funded Cat Linh-Ha Dong urban railway project, the first of its kind in Hanoi, to the municipal government on November 6 for commercial operations.

Local authorities will decide the operating timetable but passengers will benefit free rides in the first 15 days of operations, Director of the Hanoi Department of Transport Vu Van Vien said.

“Hanoi has been fully prepared for the operations which will be in discussions between the local authorities in the Ministry of Transport. In the initial operations, four to six trains will be used” Vien told The Hanoi Times.

He added that the quality assessment results of the metro line were approved by the State Council for Acceptance of Construction Projects on October 29. It is the final step for the project to begin commercial operations.

 Hanoi's first metro line ready to welcome passengers. Photo: Pham Cong/The Hanoi Times

Vu Hong Truong, director of Hanoi Railway Company Limited, the unit that directly operates the service, said that the station staff will count the number of passengers.

Notably, the ticketing area is marked for people to keep a safe distance while lining up. Passengers entering and exiting stations must scan a QR code. Each station has an isolation room for any person suspected of being infected with Covid-19, Truong added.

The fares are expected to start at VND8,000 (35 US cents) for the shortest distance, while the maximum cost for a trip covering the entire line between Yen Nghia Station and Cat Linh Station, will be VND15,000.

Commuters can enjoy unlimited rides in a single day if they purchase a Day Pass which costs VND30,000 (US$1.31) while a monthly pass will cost VND200,000 (US$8.72), with a 50% reduction in price for students and workers at industrial parks.

In a related move, Deputy Prime Minister Le Van Thanh requested that the Hanoi authorities thoroughly examine the operation plan to facilitate the movement of passengers using the mass transit network.

He also required the strict enforcement of Covid-19 prevention and control measures, ensuring traffic safety, and transparent information of the project in the public.

The Cat Linh-Ha Dong urban railway is 13-kilometer long and has 12 stations and 13 trains. Each train, whose designed speed is 80 km per hour, has four carriages capable of carrying over 900 passengers.

It starts at the Cat Linh Station in Ba Dinh District and ends at the Yen Nghia Station in Ha Dong District. The metro line has total investment of approximately US$886 million. Works on the railway began in 2011 but the project left numerous setbacks and delays.

The trial run was completed in December 2020, with thousands of trips covering more than 70,000 km.

RELATED NEWS
TAG: Hanoi’s first metro line start operation Cat Linh-Ha Dong urban railway
Other news
15:05, 2024/12/18
Urban clusters as highlight in Hanoi 2050 capital planning
The urban cluster model aims to create additional growth hubs to reduce pressure on the central urban area in sectors.
14:34, 2024/12/18
Underground space: Solution to Hanoi’s urban pressure
With rapid urban population growth, underground spaces are gaining attention as a solution to relieve surface land pressures.
08:50, 2024/12/18
Hanoi prepares massive supplies for upcoming Tet celebrations
Hanoi's Department of Industry and Trade is proactively ensuring the quality of goods and managing supply in line with consumer demand for Tet 2025.
21:37, 2024/12/17
Hanoi welcomes foreign investment in urban railway projects
Hanoi's ongoing urban railway projects offer significant opportunities for foreign investors, including those from China.
18:27, 2024/12/17
Mayor of Hanoi urges people to protect environment
The program demonstrates Hanoi's strong commitment to a breakthrough in environmental protection and sustainable development.
14:31, 2024/12/17
Hanoi to treat 70% of wastewater by 2030
To achieve its goal of becoming a green city, Hanoi has identified environmental and landscape protection, addressed the causes of pollution, and restored rivers.