WORDS ON THE STREET 70th anniversary of Hanoi's Liberation Day Vietnam - Asia 2023 Smart City Summit Hanoi celebrates 15 years of administrative boundary adjustment 12th Vietnam-France decentrialized cooperation conference 31st Sea Games - Vietnam 2021 Covid-19 Pandemic
Home / Hanoinews
Vietnam’s first metro route opens
Anh Kiet 12:36, 2021/11/06
The route will help increase the number of public transport users and ease traffic congestion.

Vietnam's first metro line, the Cat Linh - Ha Dong, in the capital city of Hanoi, officially began commercial operation on November 6 morning.

Speaking at the ceremony of handing over, Vice Chairman of the Hanoi People's Committee Duong Duc Tuan said that the metro line would help increase the number of public transport users, and together with the nine other lines planned, form a key transport network to help ease traffic congestion.

Leaders of the Ministry of Transport and Hanoi sign the minute to hand over Cat Linh - Ha Dong railway project to the municipal authorities. Photo: Quy Nguyen

The project is expected to be a game changer for public transportation in a crowded city with millions of personal vehicles, Tuan said, adding that it would help the city’s mass transit network meet up to 45% of demand.

The metro line is connected with 55 public bus routes since last year and the number will rise to 59 in the future, the vice chairman noted.

On November 6 morning, the first train left Cat Linh Station in downtown Dong Da District at 7:40 am for Yen Nghia Station in south-western District of Ha Dong. A full trip on the 13-kilometer elevated track will take 23 minutes after stopping at all 12 stations.

It has an elevated line of more than 13 km with 12 stations and a rolling stock of 13 trains. Each train, whose designed speed is 80 km/h, has four carriages capable of carrying over 900 passengers.

Deputy Prime Minister Le Van Thanh, Secretary of the Hanoi Party Committee Dinh Tien Dung, Chairman of the Hanoi People's Committee Chu Ngoc Anh, Minister of Transport Nguyen Van The ride a Cat Linh - Ha Dong train. Photo: Quy Nguyen

During the trial run of the line, part of a metro line system that will comprise underground sections upon completion, was completed in December 2020, the trains made 5,740 trips covering more than 70,000 kilometers.

After being free for the first 15 days, a trip will cost VND8,000-15,000 (US$0.35-0.66) for a ticket. Commuters can enjoy unlimited rides in a single day if they purchase a day pass or monthly pass.

In the first week, the service will be from 5:30 am to 8:00 pm every day with a frequency of 15 minutes which will be increased from the second week with interval between trains of 10 minutes.

After six months, the service will be extended to 10:30 pm., and there will be a train every six minutes during rush hour.

After many years of waiting, Hanoi residents finally are able to ride the train of the Cat Linh - Ha Dong urban railway. Photo: Pham Hung

Works on the railway, built by China Railway Sixth Group, began in October 2011 and was initially scheduled for completion in 2013. However, several hurdles have stalled it for years.

Its cost increased by 57% from the original estimate to VND18 trillion (US$868 million), with 77% of it coming from official development assistance loans from China.

In January 2021, the French consultant ACT issued a test certificate along with the report, which includes 16 recommendations on risk prevention in the operation of the route, according to the Ministry of Transport.

The French consultant’s recommendations that have been met so far this year, include certification from the Firefighting Police Agency and the consultant’s step-2 safety assessment of the signal system.

The State Council for Acceptance of Construction Projects on October 29 approved the quality assessment results of the metro line, the final step for the project to begin commercial operation.

Hanoi Railway Limited Company, the operator of the project, has met all operational recommendations of the system safety assessment consultant and hired another 82 workers to increase the line’s personnel to 733 workers, according to Vu Hong Truong, the company’s director.

“The Ministry of Transport has worked with Hanoi authorities on meeting the recommendations and the measures to evacuate passengers in emergency situations. For future super-big projects, we must have a roadmap for both investment preparation and human resource training before implementation,” Truong told The Hanoi Times.

The first train for commercial operation of the Cat Linh - Ha Dong metro line in Hanoi. Photo: Pham Hung

 Trains seen on track of Hanoi's first metro line Cat Linh - Ha Dong. Photo: Duy Linh

RELATED NEWS
TAG: Hanoi’s first metro route on track inaugural run
Other news
05:50, 2024/12/19
Hanoi Aviation Forum 2024: Business opportunities in the aviation supply chain
In a modern and sustainable way, Hanoi is striving to integrate industrial products into the global value chain and develop supporting industries.
15:05, 2024/12/18
Urban clusters as highlight in Hanoi 2050 capital planning
The urban cluster model aims to create additional growth hubs to reduce pressure on the central urban area in sectors.
14:34, 2024/12/18
Underground space: Solution to Hanoi’s urban pressure
With rapid urban population growth, underground spaces are gaining attention as a solution to relieve surface land pressures.
08:50, 2024/12/18
Hanoi prepares massive supplies for upcoming Tet celebrations
Hanoi's Department of Industry and Trade is proactively ensuring the quality of goods and managing supply in line with consumer demand for Tet 2025.
21:37, 2024/12/17
Hanoi welcomes foreign investment in urban railway projects
Hanoi's ongoing urban railway projects offer significant opportunities for foreign investors, including those from China.
18:27, 2024/12/17
Mayor of Hanoi urges people to protect environment
The program demonstrates Hanoi's strong commitment to a breakthrough in environmental protection and sustainable development.