WORDS ON THE STREET 70th anniversary of Hanoi's Liberation Day Vietnam - Asia 2023 Smart City Summit Hanoi celebrates 15 years of administrative boundary adjustment 12th Vietnam-France decentrialized cooperation conference 31st Sea Games - Vietnam 2021 Covid-19 Pandemic
Home / Hanoinews
Hanoi to start construction of more ring roads in 2021 - 2025
Tuan Minh 11:32, 2019/05/31
After ring road 4 is basically completed, construction of ring road 5 will be kicked off. Along with that, the city will also basically complete the network of elevated freeways in the downtown.
Hanoi will start construction of ring roads 4 and 5 in the 2021 – 2025 period, the city’s Department of Transport said, adding that these are important traffic routes that complete the backbone traffic infrastructure in the capital, local media reported.
 
Illustrative photo
Illustrative photo
Specifically, after ring road 4 is basically completed, construction of ring road 5 will be kicked off. Along with that, the city will also basically complete the network of elevated freeways in the downtown.

The detailed plan for ring road 4 was approved by the Vietnamese government in 2013 with a total investment of about VND66,500 billion (US$2.86 billion). The road, with a total length of 98 km, will run through 14 districts in Hanoi and other two provinces. The first end is at km3+695 on Noi Bai - Lao Cai highway (Soc Son district) and the end of the route is at about km35+300 on Noi Bai - Ha Long highway (Bac Ninh city). The section running through Hanoi is 56.5 km long.

Meanwhile, ring road 5 will go through the administrative boundaries of 36 districts and cities of Hanoi, Hoa Binh, Ha Nam, Thai Binh, Hai Duong, Bac Giang, Thai Nguyen, Vinh Phuc provinces. The road has a total length of more than 331 km, of which, the section in Hanoi city is about 48 km long.

Also in the period of 2021-2025, Hanoi city intends to complete the remaining sections of ring road 3 while some sections of the road have been put into operation. The whole route has a length of about 65 km, passing through districts of Dong Anh, Bac Tu Liem, Nam Tu Liem, Cau Giay, Thanh Xuan, Thanh Tri, Hoang Mai, Long Bien and Gia Lam.

For radial road system, the city will complete the entire section of belt road 4 connecting national highway 1A, axis of Ho Tay - Ba Vi, national highway 6 and 3.
Other news
23:10, 2024/12/22
Vietnam Defense Expo 2024 secures $286.3 million in deals
Vietnam presented advanced defense technologies and fostered global partnerships.
23:08, 2024/12/22
Hanoi holds grand ceremony for 80th anniversary of Vietnam People's Army
Districts in Hanoi have held grand ceremonies to recount the history of the army's founding, battles, victories and decisive role in national construction and defense.
11:54, 2024/12/22
Hanoi recognizes outstanding enterprises in 2024
Hanoi's business community has served as a driving force for the economy and contributed to policy-making for socio-economic development and global integration.
20:57, 2024/12/21
Thanh Cong Communal House listed as municipal historical site
The communal house is dedicated to Doan Thuong Dai Vuong and Princess Thu La, revered figures who made significant contributions to the people and nation.
20:34, 2024/12/21
Hanoi holds requiem for martyrs and victims of 1972 B-52 bombing massacre
The people of Hanoi will forever honor the brave souls who sacrificed their youth, blood and lives for the nation’s independence, freedom, and unity.
15:56, 2024/12/21
End-December Hanoi shopping festival to boost market
The festival is part of Hanoi Promotion Month 2024, which stimulates consumer demand and supports business sales.