The output is 460,000 tons lower than in 2013.
To meet the target, besides its East Sea activities, the joint venture is continuing operations in the Tho Trang (White Rabbit) Oil Field.
Daily oil capacity is stable at 500 tons. Wells at Ca Tam Oil Field are under exploration and construction on the pipes linking Thien Ung Oil Field to shore has accelerated.
Technology at Bach Ho (White Tiger) and Rong (Dragon) Oil Fields was upgraded to increase efficiency.
Vietsovpetro will increase exploration and seek new wells in block 091 to make the most of this block.
The company tapped 5.56 million tons of oil in 2013, 156,000 tons higher than the set target.
It contributed US$3 billion to the State budget.
- Hanoi steps up inspections to crack down on unsafe food
- SEMIEXPO Vietnam 2024 to foster growth of semiconductor industry
- Hanoi targets double-digit growth over next decade
- Hanoi's industrial production shows positive growth
- Hanoi launches Vietnamese Fashion Product Brand Festival 2024
- Exhibition promotes Hanoi's key industrial products