WORDS ON THE STREET 70th anniversary of Hanoi's Liberation Day Vietnam - Asia 2023 Smart City Summit Hanoi celebrates 15 years of administrative boundary adjustment 12th Vietnam-France decentrialized cooperation conference 31st Sea Games - Vietnam 2021 Covid-19 Pandemic
Home / Hanoinews
Hanoi wants to simplify procedures to accelerate billion-dollar ring road
Anh Kiet 16:31, 2021/04/23
Under a prime ministerial decision, ring road No.4 has a total length of 136.6 kilometers connecting Hanoi with Vinh Phuc, Hung Yen, Bac Ninh and Bac Giang provinces.

Hanoi city’s authorities have proposed the Vietnamese government to simplify procedures for speeding up billion-dollar ring road No.4 that would connect some northern provinces to boost economic growth.

 A map of Ring Road 4. Photo: batdongsannamcuong.com.vn

Vice Chairman of the municipal People's Committee Duong Duc Tuan made the statement at a recent conference to discuss the five-year socio-economic development plan (2021-2025) of the capital city.

By streamlining procedures,the Ministry of Transport (MoT) and provinces and cities involved in the projects could fast-track them, Tuan said.

Under a prime ministerial decision, ring road No.4 has a total length of 136.6 kilometers connecting Hanoi with Vinh Phuc, Hung Yen, Bac Ninh and Bac Giang provinces.

Costing some VND72 trillion (US$3.1 billion), it crosses 14 districts of the three localities. The section that runs through the capital city spans 56.5 kilometers across the seven local districts of Soc Son, Me Linh, Dan Phuong, Hoai Duc, Thanh Oai, Thuong Tin, and Ha Dong.

The road construction is considered as one of the driving forces for the city’s economic development in the next five years, Vice Chairman Duong Duc Tuan said.

The detailed plan for ring road No.4 was approved by the Prime Minister 10 years ago (Decision No. 1278 dated July 29, 2011) with the aim of reducing traffic congestion, realizing the regional transport plan, linking expressways, radial national highwaysand satellite towns. The road is scheduled to be completed in 2020 but so far works on it have not Started yet.

Under the regional road development plan, the number of ring roads connecting Hanoi city with neighboring provinces and cities will be seven, including ring roads 1, 2, 2.5, 3, 3.5, 4 and 5.

RELATED NEWS
TAG: streamlined procedure billion-dollarring road
Other news
20:31, 2024/11/24
Hanoi's largest wastewater treatment plant to start trial run in early December
Once the project is officially operational, wastewater from 150 main sewers along the banks of the To Lich River will be collected and treated before being discharged into the waterway.
21:22, 2024/11/22
Hanoi to lead national digital transformation efforts
Hanoi's implementation of Project 06 is an inspiration for other cities and provinces.
16:57, 2024/11/21
Highly received by local passengers, e-ticketing shows Hanoi on the way to become a smart city
The introduction of electronic bus tickets is in line with Hanoi's digital transformation strategy to build an intelligent transport system.
14:43, 2024/11/21
Hanoi commends outstanding individuals in vocational education
Vocational teachers are praised for their contributions for the city's socio-economic growth.
08:40, 2024/11/21
Hanoi farmers' dialogue conference scheduled for December
The conference, which will be both in-person and online, is expected to attract 100 attendees.
18:33, 2024/11/20
Hanoi lawmakers approve smart traffic development plan
The plan aims to turn Hanoi into a city with intelligent transport by 2030.