World giants get green light for US$12B wind power project in Vietnam
The project is expected to come operational from late 2022.
Singapore-based Enterprize Energy Pte. Ltd has been awarded site survey license for an offshore wind power project costing an estimated US$11.9 billion in Vietnam’s central province of Binh Thuan.
Approved by Vietnamese Prime Minister Nguyen Xuan Phuc, the license was awarded to the 3,400-MW Thanglong Wind project which is invested by Enterprize Energy Group and its partners namely Société Générale S.A., MHI Vestas Offshore Wind, ODE, and Vietnamese companies like Vietsovpetro, PVC – MS, EVN PECC3, Haduco and Hemera Media.
The investor has conducted survey of an area of 2,800 square kilometers in a year, collecting data on wind speed, migration of seabirds, mammals, and large marine species, geology, and seabed depth.
With this survey, they will continue next steps including reports on planning, environment, and on feasibility study to push the project forward.
Thanglong Wind is the world’s biggest wind power project. It is expected to cover an area of 1,000 square kilometers, about 20-50 km offshore Binh Thuan’s Ke Ga cape which has wind speed of 9.5 meter per second.
The project embraces six phases namely with the first five ones having a capacity of 600MW each, and the sixth with 400MW. The project’s components are scheduled to come operational from late 2022 to 2026.
Illustrative photo
|
The investor has conducted survey of an area of 2,800 square kilometers in a year, collecting data on wind speed, migration of seabirds, mammals, and large marine species, geology, and seabed depth.
With this survey, they will continue next steps including reports on planning, environment, and on feasibility study to push the project forward.
Thanglong Wind is the world’s biggest wind power project. It is expected to cover an area of 1,000 square kilometers, about 20-50 km offshore Binh Thuan’s Ke Ga cape which has wind speed of 9.5 meter per second.
The project embraces six phases namely with the first five ones having a capacity of 600MW each, and the sixth with 400MW. The project’s components are scheduled to come operational from late 2022 to 2026.
21:35, 2024/12/21
Regulatory efforts underway to strengthen e-commerce in Vietnam
By 2025, Vietnam's e-commerce is expected to reach 10% of retail sales and contribute to the digital economy which is estimated to account for 20% of GDP.
16:51, 2024/12/14
Hanoi honors key industrial products in 2024
This recognition is a testament to the city government's ongoing support of local businesses.
18:09, 2024/12/12
EVs take the spotlight on Vietnam's urban streets
On the streets of Hanoi, a quiet but powerful shift in transportation is underway.
13:43, 2024/12/12
Hanoi names 83 institutions Green Energy User 2024
More than 80 facilities and projects have been recognized for their innovative use of green energy in manufacturing.
12:07, 2024/12/09
Bat Trang artisans innovate to meet global market demands
To boost competitiveness, Bat Trang pottery businesses leverage information technology for product promotion.
17:56, 2024/12/07
Vietnam youth gears up for a greener future
The event sought to equip Vietnamese youth with the skills and opportunities to work together and take an active role in advancing the green economy and supporting a sustainable transition.
- Hanoi to create over 213,000 jobs in Jan-Nov
- Update on worker conditions in South Korea from Vietnamese labor authorities
- Vietnam partners with NVIDIA to establish AI research center
- Hanoi grasps opportunities to drive semiconductor industry growth
- Internet users in Vietnam to hit 100 million by 2029
- Prime Minister calls for active participation in innovative start-ups