WORDS ON THE STREET 70th anniversary of Hanoi's Liberation Day Vietnam - Asia 2023 Smart City Summit Hanoi celebrates 15 years of administrative boundary adjustment 12th Vietnam-France decentrialized cooperation conference 31st Sea Games - Vietnam 2021 Covid-19 Pandemic
Home / Investment / On-going projects
Vietnam Railway proposes to upgrade Saigon-Nha Trang railway route
Mai Nguyen 11:07, 2018/05/10
The Vietnam Railway Corporation (VNR) has proposed the Ministry of Transport to work out a project to improve the operation of the train on the Saigon-Nha Trang route.
The project also contributes to ensuring the safety and raising the speed of the train and minimizing the number of accidents owing to preventing the risk of passing red lights, exceeding speed limits, colliding other trains... by using the equipment to protect the train automatically. Furthermore, it also helps to control the entire work of the train drivers, to assist in early notification of trains approaching the crossroads guarded by sentry men to improve safety at negligible expenses.
 
Vietnam Railway proposes to upgrade Saigon-Nha Trang railway route.
Vietnam Railway proposes to upgrade Saigon-Nha Trang railway route.
The Saigon - Nha Trang railway route is 411.2km long with 36 train stations. With the proposal, this project will help improve railway infrastructure by applying a unified regulatory center and active safety systems, reducing the number of concurrent parking stops, thus increasing the railway throughput by 35 - 40%. Consequently, that will save energy and reduce costs of repairing moving parts of trains and railways by 15 – 20%.
In case it is approved, the project is expected to be implemented within 18 months. The total cost of equipment, including installation and technical assistance by experts is about VND245.6 billion (US$10.83 million), if German equipment is used or nearly VND250 billion (US$11 million), if German equipment is not used, according to VNR’s representative.
The consultant proposed a formula of cooperation in the form of BT (build-transfer), in which investors bear 70% and the Vietnam government invests 30% of the capital. The government will reimburse the investment cost to the investors after the project goes into operation.
If the study and implementation of the project on the Nha Trang – Saigon route prove safe and effective, this will lay the basis for consideration and implementation of other similar projects, according to VNR.
Other news
22:24, 2024/04/22
Vietnam starts construction of US$432 million expressway to China
The expressway will stimulate socio-economic development in four major economic zones in Vietnam: the northern, central, southern, and Mekong Delta regions.
20:05, 2023/09/13
KOICA launches new training program for Vietnamese journalists
The program is well designed and attached to new trends in South Korea and the world, which can be applied in Vietnam.
17:55, 2023/03/27
UK-funded CFA to support nine low-carbon projects in Vietnam
The CFA is part of the UK Government's efforts to help Vietnam meet the commitments made by Prime Minister Pham Minh Chinh at COP26 in Glasgow in 2021.
16:17, 2022/03/10
Hanoi’s latest proposal on Ring road No.4 project to save US$380 million
The project, estimated to be around VND87.1 trillion (US$3.81 billion), would be divided into seven sub-components and carried out under the combination of private-public partnership (PPP) and public investment mechanisms.
18:30, 2022/02/10
Construction of $120-million compostable resin factory kicks off in Hai Phong
The project, invested by An Phat Holdings, is considered the largest green materials factory in Southeast Asia.
16:51, 2022/02/06
Construction of Long Thanh International Airport must be accelerated: Prime Minister
With such sluggish construction progress, Long Thanh International Airport may not be able to become operational by 2025 as planned.