70th anniversary of Hanoi's Liberation Day Vietnam - Asia 2023 Smart City Summit Hanoi celebrates 15 years of administrative boundary adjustment 12th Vietnam-France decentrialized cooperation conference 31st Sea Games - Vietnam 2021 Covid-19 Pandemic
Home / Investment / ODA projects
ADB funds US$165 million for Vietnam’s education, infrastructure
Vna/Hanoitimes 17:12, 2015/01/24
The Asian Development Bank (ADB) has provided Vietnam with two loans totalling US$165 million to improve secondary education for ethnic minority students in the country’s poorest areas, and upgrade rural infrastructure in six central provinces.
The loans are part of ADB’s response to the Vietnamese Government’s need in prioritised areas, matching the bank’s Country Partnership Strategy for Vietnam in the 2012-15 period, said Tomoyuki Kimura, ADB Country Director in Vietnam at a signing ceremony for the loans in Hanoi on January 23. 

The first loan, valued at US$80 million, will be used to support the second phase of a project to improve secondary education for students from ethnic minority groups in most disadvantaged areas. 


 
Building on the success of the first phase, which was completed in 2014, the second phase aims to raise the enrolment rate at secondary schools in the targeted areas by 5 percent by 2020 by building 660 additional classrooms, 350 semi-boarding facilities, 250 houses for teachers, and training 24,000 teachers. Some 344 new schools will also be built during the six-year period. 

The second loan of US$85 million will be injected into a project to boost integrated rural development in six central localities of Binh Dinh, Binh Thuan, Ha Tinh, Ninh Thuan, Phu Yen and Thua Thien-Hue. 

The ADB earlier funded US$90 million to this US$168.17 million project, which was approved by the bank in 2007.
Other news
15:58, 2023/10/18
Japan gives Vietnam biggest-ever ODA package
The focus of the financial support is infrastructure, manpower, and post-pandemic economic recovery.
15:45, 2023/10/18
Japan gives Vietnam biggest-ever ODA package
The focus of the financial support is infrastructure, manpower, and post-pandemic economic recovery.
20:59, 2023/07/05
Japan provides US$422 million ODA loans to Vietnam
The loans enable Vietnam to boost its recovery strategies adopted by the National Assembly in early 2022.
16:49, 2023/04/16
Prime Minister calls for Metro No. 1 project to be completed by September
Completion of the Metro No. 1 project is scheduled for the fourth quarter of 2023, after 12 years of construction.
15:57, 2021/10/23
70% highway road in Vietnam built with Japan loans
Infrastructure projects help smooth economic connectivity among parts of Vietnam and between the country and other ASEAN nations.
05:26, 2019/10/23
Vietnam should be cautious about environmental impact investment: JICA
Inflows from emerging countries might fail to meet environmental protection requirements.